Monday, May 7, 2012

No more walking mud- we have a driveway

Last Wednesday Community Paving started work on our driveway. I got the permit from the town and Rocco bought his scooper machine and made it dance around as he graded the driveway area and then had the gravel combo material put down.
On Thursday 2 Brazillian guys installed the Belgium block sandwiching the driveway area and made a apron at the end. Friday they installed the drain connecting it to the cultec chamber piping.
Today a whole crew showed up and
used a roller machine to compact the gravel mixer then wheel barrow loads of tarmac were emptied onto the driveway and the men raked, level, used a hand roller then finally the roller machine to compact the hot tarmac down.
Rocco came at the end and did his final touch up.
It's looks great and Rocco agreed to add a skirt at the front of the property to make it look complete.

No comments:

Post a Comment