Sunday, June 17, 2012

Outside views

Back looks good in the late afternoon sun. Now just need to landscape / grass it...

Saturday, June 16, 2012

Water Depr dig up road

Friday morning 8 am I hear drilling and the water dept is outside jack hammering the road of the house to see why the water flow rate is only 12-15 gallons a minute vs 40!
The tidy work the Commisso brothers did is undone. Lets see if we can find out what the problem is.

Guest bedroom

The guest room is ready for Ba's visit from London. Nesh tests the bed out for comfort.

Front Mudroom Closet Door Handles

Nesh and Kamal, the dream team, drill through his beautiful closet doors to install the handles. Upstairs hallway closets and entry closets all done at last!

Tuesday, June 12, 2012

Master Balcony railing installed

Nesh helps Kamal on Sunday to install the sleeves for the posts and the glass panelling. Now we can sit out there.

Mission Style door locks

Kamal is up early on Saturday morning and installing the mission style door locks for the front and back mudroom.